China PatEPTd products squander tire crusher solwaste tire recycling EPT solused tire recycling EPT for sale
one period EPT
This production line incXiHu (West Lake) Dis.Hu (West Lake) Dis. major EPT and accessorial equipment comma it is used for recycling scrap-tire lparsteel tyre and textile tyre rpar comma the closing solution is rubber powEPTor reclaimed rubber
2 period This generation line incXiHu (West Lake) Dis.Hu (West Lake) Dis. the beneath colon
No
Name
Product
Number
one
Ring cutter
QQJ-twenty
1
two
Strip cutter
QTJ-380
one
3
Block cutter
QKJ-forty five
one
four
Loop EPT
YQJ-285
one
five
Conveyor gear
two
ast6
Rubber crusher
XKP400 solXKP450
solXKP560
one
7
Magnet separator
two
8
Electric powered boult
two
num9
Granulator Grinder
XFM330
ast10
Rubber tile push
XLB-50T sol550 ast550 ast4
This is for rubber tile
ast6 colon There is three varieties of rubber crusher comma you can choice the appropriate 1 comma it is count on the output excl
num9 colon You not need Granulator GrinEPTif your ultimate rubber powEPTbigger than thirty mesh interval But we require it if the powEPTless than 30 mesh and the amount of this EPT rely on the output excl
3 period of time Analysis for output
XKP400 rubber crusher colon
Output colon 4500-6000kg sol24 hour for about twenty mesh granule interval
XKP450 rubber crusher colon
Output colon 7000-12000kg sol24 hour for about twenty mesh granule time period
XKP560 rubber crusher colon
Output colon 10000-17000kg sol24 hour for about 20 mesh granule period of time
4 period of time XMF330 Rubber refine grinder
thirty-40mesh colon 2500-4500kg sol24 hour
forty-60mesh colon 2000-3500kg sol24 hour
sixty-80mesh colon 1500-2600kg sol24 hour
one-one time period Ring cutter
Goal colon To lower the steel ring from the tyre
one-two period of time Loop EPT
Merchandise
Specification
Motor EPT
15 KW
Linear speed of front roller
fifteen period5 m solmin
Ratio of speed
one period1
Dimension
1520 ast1150 ast12101mm
Objective colon To Different the metal ring from the rubber following one action time period
one-3 interval Strip cutter
Merchandise
Parameter
Motor EPT
five period5kw
Disc Diameter
380mm
Rotate Pace
18 period4r solmin
Dimension
1290 ast870 ast1550
Purpose colon To lower the aged tyre intostrip
one-4 interval Block cutter
Item
Specification
Motor EPT
11kw
Speed of major screw
420 r solmin
Out diameter of cutter
200mm
Dimension
1130 ast830 ast1100
Objective colon To Minimize the strip into block
one-5 interval Tyre crusher
Item
XKP-560
Diameter of entrance roll lparmm rpar
560 lparsmooth rpar
Diameter of back roll lparmm rpar
510 lpargroove rpar
Working size lparmm rpar
800
Linear pace of front roll lparm solmin rpar
twenty five period56
Ratio
1 colon one period30
MAX gap lparmm rpar
15
Potential lparkg solh rpar
600-800
Motor EPT lparkw rpar
seventy five
Dimension lparl astw asth rpar lparmm rpar
5064 ast2284 ast1978
Weight lparkg rpar
18000
Goal colon
Crush the rubber block into rubber powEPTand granule period of time
1-six period of time Huge conveyor equipment
Motor EPT colon 2 period2kw
The length of conveyor colon 8000mm
The width of belt colon 550mm
Velocity colon 40m solmin
To conveyor the rubber block into crusher time period
one-seven interval Tiny conveyor products
Motor EPT colon one period1kw
The duration of conveyor colon 3m
The width of belt colon 400mm
Speed colon 30m solmin
1-8 period of time Massive Magnet separator
Motor EPT colon 1 period1kw
The width of belt colon 400mm
Velocity colon 30m solmin
Function colon Independent the steel little block from the rubber powder time period
1-9 period Little magnetic separator
Motor EPT colon one period1kw
The width of belt colon 400mm
Speed colon 30m solmin
one-10 time period Large Shaking screen
Operating length colon 6000mm
Doing work width colon 1000mm
Motor EPT colon 7 period5kw
Dimensions colon 7800 ast1250 ast600mm
Function colon
lpar1 rpar separate the rubber granule and powder comma Resend the granule to crusher comma and send powEPTto Magnet separator via little conveyor belt interval
lpar2 rpar independent the textile twine from rubber powder
one-eleven time period Modest Shaking display screen
Doing work size colon 3000mm
Operating width colon 1500mm
Motor EPT colon 3kw
No | Identify | model | quantity | EPT |
EPT tire pre-processing , you will get lt fifty*50MM rubber crumb | ||||
one | Ring cutter | QQJ-20 | one | five.5 KW |
2 | Strip cutter | QTJ-380 | one | 5.5 KW |
three | Loop EPT | YQJ-285 | one | 15KW |
4 | Block cutter | QKJ-45 | 11KW | |
Rubber powder processing: you will get 3-8 MM rubber powder,at the identical time, individual the fiber and steel wire | ||||
five | Tyre crusher | XK560 | 1 | seventy five KW |
six | Large conveyor products | BCL-8 | 2 | 2 KW |
seven | Little conveyor tools | BCL-3 | one | 1.one KW |
8 | Big Magnet separator | BMS22 | one | two.two KW |
nine | Modest Magnet separator | SMS-1 | 1 | 1.one KW |
ten | Massive Shaking screen | BSS-8 | one | seven.5 KW |
eleven | Tiny Shaking display screen | SSS-three | 1 | three KW |
twelve | Fiber separator | FS110 | one | eleven KW |
13 | Wonderful grinder | XMF420 | one | 32.4 kw |
fourteen | Circle shaking display | DIA600 | one | 2.two kw |